top of page
BKG.jpg
Palmer.png

Recycling Center

Palmer Township

*Job In Progress*

Completed By:

Stacked Logo_color.png
Black letter transparent.png

Project Size:                     95,000sf

Project Location:           Easton, PA

Semmel Excavating and Engelman Construction partnered to complete the new Palmer Township Recycling Center, a drive-through facility designed to streamline waste sorting for local residents.
 
Semmel Excavating performed all site work and trenching, ensuring the site was properly graded and prepared for the installation of utilities and infrastructure. Their expertise in excavation and land preparation laid the groundwork for a smooth and efficient construction process.
 
Engelman Construction completed the concrete work, pouring durable pads to support the facility's waste collection bins and drive-through lanes. 

f5b58d0bf030a1466976895f47519835.png

Companies

Copyright 2025

About

Contact

admin@mohawkgroupinc.com

(610) 351-2999

Mohawk Group, Inc. 

5050 Tilghman St,

Allentown, PA 18104

bottom of page